
Commercial Stopcock & Isolation Installation
Commercial stopcock and isolation installation adds reliable shut-off points to your plumbing system, so you can isolate leaks, planned works, or individual areas without turning off the whole building. It is a practical upgrade for offices, retail units and small industrial sites that need safer maintenance, clearer control and less disruption when issues occur.
More information
What the service covers
The aim is simple: give you controlled, accessible ways to shut off water where and when you need it. Installation is planned to suit how your site is used, with a focus on safe working and minimal downtime.
- Install or replace main stopcocks and local isolation valves
- Add zone isolation for floors, wings, tenant areas, or specific services
- Fit isolation for key equipment such as WCs, basins, kitchens and plant
- Improve access to valves, including sensible positioning and clear identification
- Check operation and shut-off, and confirm you can isolate the intended area
- Coordinate shutdowns to reduce disruption to staff, customers and tenants
When this service is most useful
- You have no working stopcock, or it is seized, leaking, or hard to reach.
- A small leak forces you to shut down water to the whole premises.
- You manage multiple units and need clearer isolation for tenant areas.
- You are planning refurbishments and want future maintenance to be simpler.
- You want to reduce risk from water damage and speed up emergency response.
How installation is delivered
First, the system is assessed to confirm pipework layout, access, and the best points for isolation. A brief plan is agreed, including any shutdown window and whether out-of-hours work is sensible for your site.
Installation includes fitting the correct valve type for the duty, securing pipework as needed, and testing shut-off performance. Before leaving, you will be shown what has been installed and which areas each valve controls.
After installation
You receive straightforward guidance on operating the valves and what to do in an emergency. If required, further isolation points can be added later as your layout changes, helping you keep control as the premises evolves.
Frequently Asked Questions
What is the difference between a stopcock and an isolation valve?
Will the water need to be turned off during installation?
Can you add isolation valves for specific areas or tenant units?
How do you minimise disruption to a working site?
Do new valves need any ongoing maintenance?
Related Services
Complete your experience with these services
- ViewPlanned Preventative Maintenance (Plumbing)
- ViewCommercial Water Supply Installation
- ViewCommercial Washroom Installation
- ViewCommercial Toilet Repairs
Show more services
- ViewCommercial Plumbing Repairs
- ViewCommercial Plumbing Maintenance
- ViewCommercial Plumbing Fault Diagnosis
- ViewCommercial Plumbing Compliance Works
- ViewCommercial Pipework Installation
- ViewCommercial Pipework Alterations
- ViewCommercial Leak Repair
- ViewCommercial Drainage Repairs
- ViewCommercial Drain Unblocking
- ViewCommercial Appliance Water Connections