Bathroom Installations & Refurbishments

Accessible Bathroom Installation

Accessible bathroom installation creates a safer, easier-to-use space without compromising on a clean finish. The service focuses on practical layout, reliable plumbing, and carefully fitted fixtures so the bathroom works well for everyday mobility needs now and in the future.

More information

What accessible bathroom installation covers

A project-based installation designed around safety, comfort, and straightforward day-to-day use. Work is planned and delivered in clear stages, with testing before handover.

  • Initial survey and practical layout input based on mobility needs
  • Strip-out and isolations (where required) to prepare for new plumbing runs
  • First fix plumbing for hot, cold and waste to suit the new layout
  • Installation of accessible fixtures, for example walk-in showers, comfort-height toilets and easy-reach basin taps
  • Fitment of safety-focused components, such as thermostatic shower valves and securely fixed supports
  • Second fix connections, sealing, and commissioning
  • Testing of water and waste systems for leaks, flow, pressure and correct operation

Who this service is for

This installation is a good fit if you need a bathroom that reduces slips, awkward steps, and difficult reaches. It is commonly chosen by homeowners planning ahead, households supporting a relative, and landlords aiming for durable, low-hassle bathrooms that are easier for tenants to use.

How the installation is delivered

Work starts with a survey to understand the existing plumbing, drainage routes, and practical constraints. You then receive a clear scope of works, a schedule for the plumbing stages, and guidance on any decisions needed before the installation begins.

The installation is typically completed across first fix and second fix phases, with fixtures connected and commissioned at the end. If other trades are involved (for example electrics, plastering or tiling), the plumbing work is sequenced to keep the project moving and avoid rework.

After handover

Once installed, the system is checked for correct operation and safe temperature control where relevant. You are shown how to isolate key supplies, use any new controls, and keep fixtures working reliably with simple maintenance steps. If you later need adjustments, replacements, or servicing, the plumbing can be updated without starting from scratch.

Frequently Asked Questions

Can you install a walk-in shower or wet room for easier access?
Yes, the installation can be planned around a level-access shower or wet room style layout. The plumbing is set out to suit the chosen tray or floor former and the required waste position, then fully tested at the end.
Do you help with the layout and product choices for accessibility?
Yes, you can get practical input on layouts and fixture options that improve reach, stability, and ease of use. Final choices are agreed before work starts so the pipework and fixings are positioned correctly.
How long does an accessible bathroom installation take?
Timescales depend on the size of the bathroom, how much is being changed, and whether other trades are needed. After a survey, you will get a clear plan of the stages and an estimated timeframe for completion.
Can you work to occupational therapist recommendations or an existing specification?
Yes, the installation can follow a supplied specification, drawings, or product list. Any practical constraints found on site will be discussed early so you can make informed decisions before work proceeds.
Do I need to supply the bathroom fixtures and fittings?
Either approach works. You can supply chosen items, or the installation can be delivered with fixtures sourced to match the agreed specification, with compatibility checked before fitting.

Related Services

Complete your experience with these services

  • Wet Room Installation
    View
  • Toilet Installation (Bathroom Project)
    View
  • Shower Installation (Bathroom Project)
    View
  • Full Bathroom Installation
    View
Show more services
  • En-Suite Installation
    View
  • Cloakroom Installation
    View
  • Bathroom Refurbishment
    View
  • Bathroom Plumbing Second Fix
    View
  • Bathroom Plumbing First Fix
    View
  • Bathroom Pipework Upgrade
    View
  • Bathroom Layout Alteration
    View
  • Bathroom Appliance Installation
    View
  • Bath Installation
    View
  • Basin Installation (Bathroom Project)
    View