Shower Installation (Bathroom Project)
A shower installation within a bathroom or wet room project needs more than fitting the visible parts. This service covers the plumbing work from planning pipe routes and wastes through to final connections and commissioning, so your shower runs at the right temperature and pressure, drains correctly, and is fully tested before handover.
More information
What this shower installation service covers
A coordinated shower install as part of a full bathroom or wet room renovation, delivered in clear stages.
- Planning the shower layout, pipe routes, waste position and access for future maintenance
- First fix plumbing for hot, cold and waste pipework, including isolation valves where appropriate
- Allowing for the chosen shower type (for example thermostatic mixer, concealed valve, fixed head and handset)
- Connecting the shower valve, riser, outlets, tray or wet room waste as part of the wider bathroom build
- Testing for leaks, stable temperature control, adequate flow and correct drainage
- Handover guidance on safe use, cleaning and basic maintenance
When this service is a good fit
- You are renovating a bathroom and want the shower position, valve and head set out accurately
- You are switching from a bath to a shower and need wastes and pipework altered cleanly
- You want concealed pipework and fittings fitted and aligned with the finished walls
- You need a more reliable shower due to fluctuating temperature, weak flow or slow drainage
- You are upgrading a rental property or small commercial washroom and need robust, serviceable installation
How the installation is delivered
Work is typically completed in two stages to match the bathroom build. First fix is completed once layouts are agreed, then second fix follows after walls, tiling and bathroom furniture are ready. Final commissioning checks performance and identifies any snags while access is still available.
After installation
You receive a clear handover of what has been installed and how to look after it. If the shower is part of a wider bathroom project, testing is completed alongside the rest of the water and waste system so any issues are picked up early. Ongoing servicing can be arranged if the shower includes components that benefit from periodic checks.
Frequently Asked Questions
What types of showers can be installed as part of a bathroom project?
Do I need to choose the shower and fittings before first fix plumbing starts?
Can you help if my current shower has low pressure or unstable temperature?
How long does shower installation take during a bathroom renovation?
What checks are completed before the shower is handed over?
Related Services
Complete your experience with these services
- ViewWet Room Installation
- ViewToilet Installation (Bathroom Project)
- ViewFull Bathroom Installation
- ViewEn-Suite Installation
Show more services
- ViewCloakroom Installation
- ViewBathroom Refurbishment
- ViewBathroom Plumbing Second Fix
- ViewBathroom Plumbing First Fix
- ViewBathroom Pipework Upgrade
- ViewBathroom Layout Alteration
- ViewBathroom Appliance Installation
- ViewBath Installation
- ViewBasin Installation (Bathroom Project)
- ViewAccessible Bathroom Installation