Bathroom Layout Alteration
Bathroom layout alteration is a project-based plumbing service that lets you move fixtures to a layout that suits your space. It covers the safe relocation of water and waste pipework, then the accurate connection and testing of your bathroom fittings so everything works properly behind the walls and under the floor.
More information
What a bathroom layout alteration covers
A layout change is more than moving a basin or WC. The service focuses on getting the pipework right first, so your new bathroom works reliably and is easy to maintain.
- Review of the existing layout and what is practical for the new positions
- Isolation and safe disconnection of existing supplies and wastes
- Relocation of hot and cold feeds to suit the new fixture positions
- Relocation of waste and soil pipework, with correct falls and venting where required
- First fix plumbing before walls, floors and tiling are finished
- Second fix plumbing to connect bath, shower, WC, basin, taps and valves
- Pressure testing and leak checks on water pipework
- Flow and drainage testing on all wastes
- Clear handover notes on shut off points and access panels (where fitted)
When a layout alteration is the right choice
- You want a better use of space, such as swapping a bath for a walk-in shower
- The current layout is awkward, with poor access or wasted floor area
- You are refurbishing and want to move the WC, basin or shower to a more practical position
- You are upgrading a rental property and need a robust, serviceable layout
- You need a layout that suits a small commercial washroom and regular use
How the work is delivered
Work is usually planned in stages to fit around building, plastering and tiling. The first fix stage sets the new pipe routes and connection points, then everything is tested before surfaces are closed up.
Once finishes are ready, the second fix stage connects the fixtures, seals where needed and checks operation. You will be advised in advance about any water shut-offs, access requirements, and what needs to be ready for each visit.
After completion
All connections are tested, and any final adjustments are made so taps, wastes and flushes operate correctly. You will be shown key isolation valves and any service points to keep future maintenance straightforward.
Frequently Asked Questions
Can you move a toilet, shower or bath to a different position?
Do you handle both the pipework relocation and the final connections?
How long does a bathroom layout alteration take?
Will the water need to be turned off, and will there be disruption?
Do I need other trades for a layout change?
Related Services
Complete your experience with these services
- ViewWet Room Installation
- ViewToilet Installation (Bathroom Project)
- ViewShower Installation (Bathroom Project)
- ViewFull Bathroom Installation
Show more services
- ViewEn-Suite Installation
- ViewCloakroom Installation
- ViewBathroom Refurbishment
- ViewBathroom Plumbing Second Fix
- ViewBathroom Plumbing First Fix
- ViewBathroom Pipework Upgrade
- ViewBathroom Appliance Installation
- ViewBath Installation
- ViewBasin Installation (Bathroom Project)
- ViewAccessible Bathroom Installation